2. Building management: air handling maintenance
Client Sector:
Building management
Summary Results:
  • All significant H&S risk was removed
  • Greasing time was reduced from an average of 51 minutes per event, to zero minutes
  • The project provided significant time/cost savings for the organisation
8. Lean transformation at an automotive manufacturing site
Client Sector:
Manufacturing
Summary Results:
  • Manufacturing lead time fell from 13.5 days to 5.9 days
  • Manufacturing volumes increased by 73%
  • Plant inventory turns increased from 8 to 13 annually.