6. Raw material sampling: pharmaceutical manufacture
Client Sector:
Life Sciences manufacturing
Summary Results:
  • The revised process flow had 18% fewer steps
  • The error rate reduced by 91%
  • The average sampling time reduced by 45%
  • The resources required reduced from 3 to 4 people to 2 to 3 people, depending on the sampling procedure

11. H&S: Replacement of open blades on the shop floor
Client Sector:
Manufacturing
Summary Results:
  • Certified team-based lean six sigma yellow belt project
  • H&S training in retractable knife use
  • Post implementation survey = high satisfaction rating
  • Reduced accident risk