Standard work case study

- Customer satisfaction
- Teamwork
- Streamlined processes
- Reduced costs
1. Pharmaceutical manufacture: OOS and the value of a gemba walk
Client Sector:
Life Sciences manufacturing
Summary Results:
  • Cpk improved dramatically from the generic 0.35, to 1.16 and 1.17
  • The reject rate fell from 18% to 1%
  • The cost savings on the reduction in investigations was considerable
  • The client’s reputation was restored in the market
2. Building management: air handling maintenance
Client Sector:
Building management
Summary Results:
  • All significant H&S risk was removed
  • Greasing time was reduced from an average of 51 minutes per event, to zero minutes
  • The project provided significant time/cost savings for the organisation
4. Raw material sampling: pharmaceutical manufacture
Client Sector:
Life Sciences manufacturing
Summary Results:
  • The revised process flow had 18% fewer steps
  • The error rate reduced by 91%
  • The average sampling time reduced by 45%
  • The resources required reduced from 3 to 4 people to 2 to 3 people, depending on the sampling procedure

6. Lead time reduction & cargo tracking
Client Sector:
Transportation & Logistics
Summary Results:
  • Depot personnel had a better understanding of the relevant metrics
  • Proof of concept enabled implementation of software application
  • The Lean Ireland report was used by depot management to further promote the software application
9. Digitization/ error proofing end-of-month reconciliation in finance
Client Sector:
Financial Services
Summary Results:
  • Month end reconciliation time reduced from 60 hours to 25 hours
  • €40K annual labour hours saved
10. Digitization/ automation of key performance indicators in manufacturing
Client Sector:
Life Sciences manufacturing
Summary Results:
  • Automated online SPC implemented – linking machine, databases and operations management
  • Live real-time online graphics on display on the production line
  • PowerBI software and dashboard now managed by the client