Health & safety case study

- Customer satisfaction
- Teamwork
- Streamlined processes
- Reduced costs
2. Building management: air handling maintenance
Client Sector:
Building management
Summary Results:
  • All significant H&S risk was removed
  • Greasing time was reduced from an average of 51 minutes per event, to zero minutes
  • The project provided significant time/cost savings for the organisation
11. H&S: Replacement of open blades on the shop floor
Client Sector:
Manufacturing
Summary Results:
  • Certified team-based lean six sigma yellow belt project
  • H&S training in retractable knife use
  • Post implementation survey = high satisfaction rating
  • Reduced accident risk