Green belt project example

- Customer satisfaction
- Teamwork
- Streamlined processes
- Reduced costs
1. Pharmaceutical manufacture: OOS and the value of a gemba walk
Client Sector:
Life Sciences manufacturing
Summary Results:
  • Cpk improved dramatically from the generic 0.35, to 1.16 and 1.17
  • The reject rate fell from 18% to 1%
  • The cost savings on the reduction in investigations was considerable
  • The client’s reputation was restored in the market
2. Building management: air handling maintenance
Client Sector:
Building management
Summary Results:
  • All significant H&S risk was removed
  • Greasing time was reduced from an average of 51 minutes per event, to zero minutes
  • The project provided significant time/cost savings for the organisation
9. Digitization/ error proofing end-of-month reconciliation in finance
Client Sector:
Financial Services
Summary Results:
  • Month end reconciliation time reduced from 60 hours to 25 hours
  • €40K annual labour hours saved